Viva Bus Operations, Maintenance & Storage Facility


vivabus-550x385

Integral Group is providing LEED fundamental & enhanced commissioning services for the Viva Bus Operations, Maintenance & Storage facility in Richmond Hill, Ontario. Comprising 49,050 m² the facility will accommodate 250 articulated buses and 430 employee and visitor parking spaces. The project is being delivered through a Private Public Partnership for the Region of York, and will be pursuing LEED® Silver certification.
As part of our services, we are completing the review of the Owner’s project requests, design documents at mile stone stages, preparing and carrying out pre-functional and functional performance tests and validating all related matters post occupancy. Systems to be  commissioned include high efficiency air handling units with heat recovery systems, gas detection systems, boilers, pumps, fans, compressed air systems and rainwater harvesting system.
The building management system (BMS) will monitor and optimize controls throughout the building and will be connected to the York Region Wide Area Network (WAN). Graphic provided on the BMS will be checked for accuracy and functionality to ensure the system provides the necessary feedback information to operate this facility.

Please follow and like us:
Get in Touch
×

Get In Touch

Top